To make a Gantt chart, list the tasks of your project, give each one a start date and a duration, and draw them as horizontal bars on a timeline. Then link the tasks that depend on each other and add milestones for the key dates. You can do it with a free online Gantt chart maker in a few minutes, or in a spreadsheet if you prefer.
What you need before you start
- A goal: what the project delivers, in one sentence.
- A deadline, or at least a target month.
- The people involved, so each task can have an owner.
How to create a Gantt chart in 6 steps
- Set the goal and the end date. If the date is fixed, you will plan backwards from it.
- List the tasks. Break the work into tasks that take a few days to two weeks. Group them into three to six phases: planning, design, build, launch. Tasks longer than a month hide problems; split them.
- Estimate durations. Ask the person who will do the work. Add a little margin to tasks that depend on someone outside the team.
- Link dependencies. “Testing” cannot start before “Build” is finished. Draw that link: when one task slips, the tasks after it move too.
- Add milestones. A milestone has no duration: a sign-off, a delivery, a launch. Clients and managers read the milestones first.
- Share and update. A Gantt chart is useful only if it reflects reality. Update it after the weekly meeting and share a read-only link.
Example: a small website project
| Task | Duration | Depends on |
|---|---|---|
| Kickoff meeting | 1 day | – |
| User research | 1 week | Kickoff |
| Design | 2 weeks | User research |
| Build | 3 weeks | Design |
| Testing and fixes | 1 week | Build |
| Launch (milestone) | – | Testing |
On the chart, each row becomes a bar. Because every task waits for the one before, this is also the critical path: any delay pushes the launch. More layouts are in our Gantt chart examples.
Which tool to use
| Online Gantt chart builder | Excel or Google Sheets | PowerPoint | |
|---|---|---|---|
| Time to first chart | 2–5 min | 15–30 min | 10–20 min |
| Dependencies that move | Yes | No (manual) | No |
| Easy to share | Read-only link | File | Slide |
| Best for | Projects you update | Simple, stable plans | One-off presentations |
Step-by-step guides: how to make a Gantt chart in Excel, in Google Sheets and in PowerPoint. Or skip the setup with a ready-made Gantt chart template.
Common mistakes
- Too much detail. 15 to 40 rows is plenty for most projects. Keep the to-do level on a Kanban board.
- No dependencies. Without links, the chart looks right on day one and wrong by week two.
- No owner. Every task needs a name next to it.
- Never updated. Set a weekly slot to move the bars.
Questions
What is the easiest way to make a Gantt chart?
Use an online Gantt chart maker: type your tasks, drag the bars to set dates, and link dependencies. It takes a few minutes and needs no install.
Can I make a Gantt chart in Excel?
Yes, with a stacked bar chart or conditional formatting. It works for simple plans but dependencies don’t update on their own.
How many tasks should a Gantt chart have?
Most projects read well with 15 to 40 rows. Group tasks into phases and keep small to-dos elsewhere.
What is a gantt chart builder?
A tool that turns a list of tasks and dates into a Gantt chart, with bars you can drag and dependencies that move together.
Is there a free Gantt chart maker?
Yes. Ganttmint is free and works in the browser without an account.