What is Kanban? A simple definition, with examples

Kanban defined in plain words: where it comes from, how a Kanban board works, WIP limits, Kanban vs Scrum, and how to start a board in 10 minutes.

This is a real Kanban board, not a picture. Drag a card to the next column, then go full screen to keep it.

Kanban is a way of managing work by making it visible on a board and limiting how much is in progress at once. Each task is a card, each column is a stage (such as To do, In progress, Done), and cards move from left to right as the work gets done.

The word is Japanese: kanban roughly means “signboard” or “visual card”. The idea is simple enough to use on a fridge and solid enough to run a software team.

Where Kanban comes from

Kanban started on Toyota’s factory floors in the late 1940s and 1950s, as part of what became the Toyota Production System. Taiichi Ohno and his teams used cards to signal when a station needed more parts, so they produced only what was actually needed. In the 2000s, David J. Anderson and others adapted the idea to knowledge work, and the Kanban method spread to software, marketing, design and support teams.

How a Kanban board works

A Kanban board is the heart of the method. The simplest one has three columns:

To doIn progressDone
Write launch emailPricing pageWireframes
Mobile QAHome pageUser interviews
Contact formProject setup

Teams often add a Review or Blocked column. The rule stays the same: one card per piece of work, moved by the person doing it, so the board always shows the real state of things. Try it on the board above.

The core practices of the Kanban method

  1. Visualise the work. Every task is on the board, not hidden in an inbox or someone’s head.
  2. Limit work in progress (WIP). Set a maximum number of cards per column and finish before starting.
  3. Manage the flow. Watch where cards pile up. That column is your bottleneck.
  4. Make the rules explicit. Agree on what “Done” means and when a card can move.
  5. Review regularly. A short weekly look at the board beats a long monthly report.
  6. Improve in small steps. Change one rule at a time and see what happens.

WIP limits, explained with an example

Say a team of three has nine cards in In progress. Everyone is busy, yet nothing ships, because each person keeps switching between three tasks. Set a WIP limit of four for that column: once four cards are in progress, nobody starts a new one. People help finish what is stuck instead, and cards start reaching Done again. A common starting point is one or two cards per person.

How to measure a Kanban system

  • Lead time: how long a card takes from the moment it is requested to Done.
  • Cycle time: how long it takes once work has started.
  • Throughput: how many cards reach Done per week.
  • Cumulative flow diagram: a stacked chart of cards per column over time. A band that keeps widening points to a bottleneck.

Kanban vs Scrum

KanbanScrum
RhythmContinuous flowFixed sprints, often two weeks
RolesNone requiredProduct owner, Scrum master, team
Changing prioritiesAny timeBetween sprints
Main limitCards in progressWork per sprint
Best forSupport, operations, marketing, steady streams of workProduct teams building in increments

Many teams mix the two and call it Scrumban: sprints for planning, a Kanban board with WIP limits for the daily work.

Kanban and Gantt charts

A Kanban board shows what is happening now. A Gantt chart shows when things are due and what depends on what. Projects with a deadline need both. In Ganttmint they are two views of the same tasks: move a card to Done and its bar on the timeline shows it; push a date on the Gantt and the card keeps it.

Start a Kanban board in 10 minutes

  1. Open a free Kanban board. No account needed.
  2. Write one card per task. Keep each card small enough to finish in a few days.
  3. Agree on a WIP limit for In progress.
  4. Look at the board together for five minutes, a few times a week.

Prefer to start from a plan? Pick a project template and switch to the Kanban view: the tasks are already there.

Going further: Kanban principles, practices and metrics, Kanban vs Scrum, and five Kanban board examples to copy.

Building a board in a tool you already have? See Kanban in Notion and Kanban in OneNote.

Questions

What is Kanban in simple terms?

A board with columns for each stage of work and a card for each task. You move cards across the board as work gets done, and you limit how many are in progress.

What does the word kanban mean?

It is Japanese and roughly means “signboard” or “visual card”.

Is Kanban agile?

Yes. Kanban is one of the most widely used agile approaches, alongside Scrum.

What is the difference between Kanban and Scrum?

Kanban is a continuous flow with limits on work in progress. Scrum works in fixed sprints with set roles and ceremonies.

Can I use Kanban on my own?

Yes. A personal Kanban board with To do, Doing and Done columns is one of the simplest ways to organise your week.