Kanban and Scrum are both agile methods, but they organise work differently. Scrum works in fixed sprints, usually two weeks, with set roles and a board that resets each sprint. Kanban is a continuous flow: no sprints, no required roles, and a board that never resets, with limits on work in progress.
Kanban vs Scrum at a glance
| Kanban | Scrum | |
|---|---|---|
| Cadence | Continuous flow | Fixed sprints (1–4 weeks) |
| Roles | None required | Product owner, Scrum master, developers |
| Planning | On demand (replenishment) | Sprint planning at the start of each sprint |
| Changes mid-way | Any time | Avoided during a sprint |
| Limits | WIP limit per column | Sprint scope |
| Key metrics | Cycle time, throughput | Velocity, burndown |
| Meetings | Stand-up, regular reviews | Planning, daily scrum, review, retrospective |
| Best for | Support, ops, marketing, steady streams of requests | Product teams shipping increments |
Scrum board vs Kanban board
Both look like columns of cards. The difference is in the rules: a Scrum board holds only the items committed for the current sprint and is cleared at the end of it. A Kanban board is permanent, and each column can have a WIP limit: when “In progress” is full, nobody pulls a new card. Try it on the board above.
When to choose Kanban
- Work arrives unpredictably: support tickets, requests, operations.
- Priorities change often and you can’t wait for the next sprint.
- You want to improve an existing process without new roles.
When to choose Scrum
- You build a product in increments and can plan two weeks ahead.
- The team benefits from a fixed rhythm of planning, review and retrospective.
- Stakeholders want a demo at a regular date.
Kanban vs agile
It is not either-or: agile is the family of values and principles, and Kanban and Scrum are two ways to apply them. “Kanban vs agile” really means “Kanban vs the other agile methods”.
Scrumban: the mix
Many teams keep Scrum’s sprints and retrospectives but run the board with Kanban rules: WIP limits and pulling work when there is capacity. It suits teams moving from Scrum to Kanban, or mixing planned features with incoming fixes.
Where a Gantt chart fits
Neither method shows dates across months. Release plans, dependencies on other teams and fixed deadlines still need a timeline. In Ganttmint the same tasks open as a Kanban board and as a Gantt chart; for sprint planning, start from the sprint planning template, and read how agile teams use Gantt charts.
To go deeper on Kanban itself, see Kanban principles, practices and metrics.
Questions
What is the main difference between Kanban and Scrum?
Scrum works in fixed sprints with set roles; Kanban is a continuous flow with limits on work in progress and no required roles.
Is Kanban better than Scrum?
Neither is better in general. Kanban suits unpredictable, continuous work; Scrum suits product teams that can plan in sprints.
Can you use Kanban and Scrum together?
Yes. Scrumban keeps Scrum’s sprints and retrospectives and adds Kanban’s WIP limits and pull system.
Does Kanban have sprints?
No. Work flows continuously; teams review regularly instead of at sprint boundaries.
What is the difference between a Kanban board and a Scrum board?
A Scrum board holds the current sprint and resets; a Kanban board is permanent and uses WIP limits per column.