PowerPoint has no Gantt chart button, but there are three good ways to get one on a slide: build a stacked bar chart, draw a table with coloured cells, or export a PNG from a Gantt tool and paste it. The first two take 10 to 20 minutes; the third takes two.
Method 1: stacked bar chart
- Go to Insert → Chart → Bar → Stacked Bar. A small data sheet opens.
- In column A, list your tasks. In column B, the start day (0 for the first task, then the number of days after the project start). In column C, the duration in days. Delete the extra sample column.
- Close the data sheet. Click the bars of the start series, then Format Data Series → Fill → No Fill. Only the durations remain visible.
- Click the vertical axis, open Format Axis and tick Categories in reverse order so the first task is at the top.
- Remove the legend, add a title and pick your brand colour for the bars.
Good for: a plan that stays editable inside the deck. Limits: no real dates on the axis unless you convert them to numbers, no arrows between tasks, and every change is done twice, in the plan and in the slide.
Method 2: a table
- Insert a table with one column for the task names and one column per week.
- Fill the cells each task covers with a colour; use a darker shade or a diamond symbol for milestones.
- Merge the header cells by month if the project is long.
It is quick for short plans of 8 to 12 rows and easy to read in a meeting. Beyond that, it becomes hard to maintain.
Method 3: build it in a Gantt tool, export a PNG
- Build the plan in Ganttmint: type the tasks, drag the bars, link the ones that depend on each other.
- Open the ⋯ menu and export a PNG (or a PDF).
- In PowerPoint, Insert → Pictures, or simply paste.
You get dates, dependencies and milestones, and when the plan changes you export again instead of rebuilding the chart. Try it here:
Which method should you use?
| Stacked bar chart | Table | Export from Ganttmint | |
|---|---|---|---|
| Time to build | 10–20 min | 10 min | 2–5 min |
| Real dates | With effort | Yes, by hand | Yes |
| Dependencies | No | No | Yes |
| Update when the plan changes | Edit the data sheet | Recolour cells | Export again |
| Editable in the slide | Yes | Yes | No (image) |
Use a template
Start from our project timeline template or one of the Gantt chart templates, adjust it online, then export a PNG for your slide. If your team prefers spreadsheets, the same plans exist as Excel Gantt chart templates.
Tips for a readable Gantt slide
- Show 10 to 15 rows at most. Group tasks into phases and show the phases.
- Use weeks or months on the axis, not days, for anything longer than a month.
- Highlight the milestones people care about and the today line.
- One colour per phase, not per task.
Questions
Does PowerPoint have a Gantt chart template?
PowerPoint has no built-in Gantt chart type. You can build one with a stacked bar chart or a table, or paste an image exported from a Gantt tool.
How do I make a Gantt chart in PowerPoint quickly?
Build it in an online Gantt tool, export a PNG and paste it into your slide. It takes a few minutes.
Can I show dependencies in PowerPoint?
Only by drawing arrows by hand. A Gantt tool draws and updates them for you.
How do I update a Gantt chart in my deck?
With a stacked bar chart, edit its data sheet. With an exported image, update the plan and export it again.
Does this work in Google Slides?
Yes. The table method and the PNG export work the same way in Google Slides.