Gantt chart examples: 6 samples you can copy

Six Gantt chart examples with tasks, durations and dependencies: software, marketing, construction, event, research and a simple personal plan.

A Gantt chart example shows a project as a list of tasks on the left and bars on a timeline on the right: each bar starts and ends on the task’s dates, arrows show dependencies, and diamonds mark milestones. Below are six samples for common projects, each with the phases, tasks and durations you can reuse.

1. Software release (8 weeks)

PhaseTasksWeeks
DiscoveryRequirements, user stories1–2
BuildSprint 1, sprint 2, code review3–6
ReleaseQA, bug fixes, release (milestone)7–8

Typical feature: two sprints in a row, and QA that cannot start before the second sprint ends. For two-week sprints, use the sprint planning template.

2. Marketing campaign (13 weeks)

Strategy first, then content production, then channels running in parallel: email, social, ads. A mid-campaign review milestone lets you move budget to what works. Try the version in the mini Gantt below, or start from the marketing timeline template.

Open any example and edit itFree, no signup. Drag a bar to change its dates.
Make your Gantt chart

3. Construction or renovation (24 weeks)

PhaseTasksWeeks
PreparationSurvey, permits, contracts1–5
StructureDemolition, structural work, roof6–11
ServicesPlumbing and electrics, drywall, screed12–17
Finishes and handoverFlooring, painting, kitchen, snagging18–23

The chain is long and strict: inside work waits for the roof. See the construction schedule template.

4. Event (10 weeks)

Book the venue first (milestone), then programme, invitations and logistics in parallel, with a dress rehearsal just before the day. The event planning template follows this shape.

5. Research project or thesis (6 months)

Proposal, literature review, data collection, analysis, writing, supervisor review, submission. Writing overlaps with data collection, which is what makes the Gantt chart useful here. UK students can start from the EPQ Gantt chart.

6. A simple personal plan (4 weeks)

Moving house, a job search, a small renovation: five to ten tasks, no dependencies needed, one bar per task. The simple Gantt chart template is made for that.

How to read these examples

  • Bars that touch end to end are dependent tasks; together they often form the critical path.
  • Bars stacked in the same weeks run in parallel and usually need different people.
  • Diamonds are milestones: dates people outside the team care about.

To build your own, follow how to make a Gantt chart, or open any Gantt chart template and rename the tasks.

Questions

What is an example of a Gantt chart?

A product launch plan where each task, such as design, build, testing and launch, is a bar on a timeline, with arrows for dependencies and a diamond for the launch date.

Where can I find a free Gantt chart sample?

Every example on this page has a free template you can open online or download for Excel.

What should a Gantt chart include?

Tasks, start and end dates or durations, dependencies, milestones and ideally an owner and progress for each task.

Can I use these examples in Excel?

Yes. Most templates have an Excel version, and the online versions export to Excel.

How long should a Gantt chart be?

As long as the project, at a scale you can read: days for a few weeks, weeks for a few months, months for a year or more.