1. Home
  2. Blog
  3. Timeline in Google Slides

How to make a timeline in Google Slides (3 ways)

Make a timeline in Google Slides with the built-in timeline diagram, with shapes, or with an image from a timeline maker. Steps and design tips.

Google Slides has a built-in timeline: go to Insert → Diagram → Timeline, choose how many dates you need, and type your milestones. You can also draw a timeline with shapes, or build it in a timeline tool and insert it as an image when you need real dates and task durations.

Method 1: the built-in timeline diagram

  1. Open your slide and go to Insert → Diagram. A panel opens on the right.
  2. Choose Timeline. Set the number of dates (up to six or so) and a colour.
  3. Click a layout to insert it, then click each placeholder to type the date and label.
  4. To add a point, copy a group of shapes and paste it; to remove one, delete the group.

Good for: a handful of milestones. Limits: points are evenly spaced, there are no durations, and adding many points takes manual alignment.

Method 2: shapes and lines

  1. Draw a line across the slide (Insert → Line, hold Shift).
  2. Add circles or diamonds for milestones and text boxes for labels.
  3. Add rectangles under the line for phases, sized to their length.
  4. Select everything and use Arrange → Align and Distribute, then group.

Method 3: make it in a timeline tool, insert as an image

  1. Build the timeline in the free timeline maker.
  2. Export a PNG from the ⋯ menu.
  3. In Google Slides, Insert → Image → Upload from computer.

Dates are to scale, tasks can be linked, and when the plan changes you export again. Try it:

Make it here, paste it thereFree, no signup. Export a PNG and insert it in your slide.
Make your Gantt chart

Which method to choose?

Timeline diagramShapesTimeline tool + image
Time3–5 min15–30 min5 min
Dates to scaleNoBy handYes
Task durationsNoBy handYes
Editable in the slideYesYesNo (image)

Tips

  • One timeline per slide; keep labels to a few words.
  • Use months or quarters for anything longer than a few weeks.
  • Highlight the next milestone in a different colour.

Same task in other tools: PowerPoint, Google Docs. The method itself: how to make a timeline.

Questions

Does Google Slides have a timeline template?

Yes. Insert, Diagram, Timeline gives ready-made timeline layouts you can edit.

How do I add more dates to a Google Slides timeline?

Copy one group of shapes in the diagram and paste it, then align it; or choose a layout with more dates.

Can I make a project timeline with real dates in Google Slides?

Build it in a timeline tool where dates are to scale, export a PNG and insert it.

How do I make a vertical timeline in Google Slides?

Draw a vertical line and add shapes and text boxes beside it, or rotate a diagram layout.

Is there a free timeline maker for Google Slides?

Ganttmint is free: make the timeline online, export a PNG and insert it in your slide.