How to make a timeline in Google Docs (3 ways)

Three ways to make a timeline in Google Docs: the Drawing tool, a table, or an image from a timeline maker. Step by step, with tips for a clean result.

Google Docs has no timeline button, but three methods work well: draw one with Insert → Drawing, lay it out as a table, or make it in a timeline tool and insert it as an image. The drawing method takes about ten minutes; the image method is the fastest for a project with real dates.

Method 1: the Drawing tool

  1. In your document, go to Insert → Drawing → + New.
  2. Choose the Line tool and draw a horizontal line (hold Shift to keep it straight).
  3. Add small circles or diamonds with the Shape tool for each milestone.
  4. Add text boxes above or below for dates and labels.
  5. Click Save and close. Double-click the drawing later to edit it.

Method 2: a table

  1. Insert → Table with one column per month (or week) and one row per task.
  2. Fill the cells each task covers with a colour (right-click → Table properties → Cell background colour).
  3. Put milestones in bold with a ◆ symbol.

It reads like a simple Gantt chart and stays easy to edit by anyone who opens the doc.

Method 3: make it in a timeline tool, insert as an image

  1. Make the timeline in the free timeline maker.
  2. Export a PNG from the ⋯ menu.
  3. In Google Docs, Insert → Image → Upload from computer.

Dates are to scale, tasks can be linked, and you re-export when the plan changes. Try it:

Or make it here in 2 minutesFree, no signup. Export a PNG and insert it in your doc.
Make your Gantt chart

What about Google Sheets?

If your dates live in a spreadsheet, build the timeline in Google Sheets and copy the chart into the doc (it stays linked, with an Update button). See how to make a Gantt chart in Google Sheets.

Tips for a clean timeline

  • Switch the page to landscape (File → Page setup) for long timelines.
  • Keep it to eight milestones or fewer.
  • Use the same colour for the same phase.

Doing the same in slides? See timelines in PowerPoint. Need the method first? Read how to make a timeline.

Working in Microsoft Word? Read how to make a timeline in Word.

Questions

Does Google Docs have a timeline template?

Not built in. You can draw one with Insert, Drawing, use a table, or insert an image from a timeline maker.

How do I make a timeline in Google Docs?

Go to Insert, Drawing, New; draw a line, add shapes and text boxes for milestones, then Save and close.

Can I edit the timeline later?

Yes. Double-click a drawing to edit it, or edit the table directly. For an image, update it in the timeline tool and insert it again.

How do I make a horizontal timeline fit the page?

Set the document to landscape in File, Page setup, and reduce the margins.

Is there a free timeline maker for Google Docs?

Ganttmint is free: make the timeline online, export a PNG, and insert it in your document.